Inside World Economy – Home
Aerial photograph of Sizewell B nuclear power station
Leiston, Suffolk · United KingdomFactory Tour · Open to the public

Sizewell B Power Station Tour

Walk an operating nuclear power station; a bus tour adds the Sizewell C construction site.

Why It Matters

A reactor set to outlast the rest of the existing nuclear fleet

Britain is keeping its existing nuclear stations generating while it finances and builds new ones. Sizewell B, on the East Suffolk coast, is one of them, with a new plant rising beside it. The construction-site bus tour is an additional visit.

A single reactor serving millions of British homes

As of July 2026, Sizewell B provides approximately 3 percent of the UK’s total electricity needs, enough for 2.5 million homes, from one reactor that runs in all weather conditions.

A second, larger station under construction next door

Sizewell C, a separate 3.2-gigawatt project and company, is expected to start generating in 2038, at an estimated GBP 38.2 billion in 2024-25 prices as of May 2026.

Keeping nuclear output on the grid past 2030

The UK’s four gas-cooled nuclear stations are due to stop generating by March 2030. Sizewell B has agreed terms to run to 2055, alongside the new Hinkley Point C, whose first reactor is due in 2030.

A construction program aimed at British suppliers

Seventy percent of Sizewell C’s construction value is set to go to British businesses. In 2025, the company expected 3,500 UK companies to join its supply chain.

Worth Knowing

The UK’s only operating pressurized water reactor is Sizewell B as of 2026, while the country’s other operating stations use gas-cooled reactors.

More than 270 terawatt-hours of electricity came from the station by 2026, enough for every Suffolk and Norfolk home for over a century.

About 900 skilled jobs are tied to the station, including about 600 full-time EDF employees and over 300 contract staff.

Eight nuclear sites make up the UK nuclear fleet managed by EDF; five are still generating, Sizewell B among them.

Sizewell B nuclear power station

What You Experience

What the visit covers

  1. A walk of about 2.7 kilometers

    Trained station guides lead the mostly outdoor route across the grounds of an operating nuclear power station.

  2. The turbine hall and its two main generators

    The route leads into the turbine hall, which houses the station’s two main turbine generators.

  3. Generating your own power (Visitor Center)

    This additional exhibition, run jointly by EDF and Sizewell C, lets visitors generate their own power and see how energy works with interactive exhibits.

  4. A ride through the construction site (Sizewell C Bus Tour)

    This additional tour takes visitors by guided minibus through the live construction site of Sizewell C, a second nuclear station being built next to Sizewell B.

What You Need to Know

Plan your visit

Access
Open to the public
Experience Type
Factory Tour
Cost
Free
Tour Times
Visitor Center: Mon–Fri, 09:00–16:00
Booking
Station tour: book 4 weeks ahead. Bus tour: book in advance

Access & Logistics

  • Station Tour: up to 3 hours, mostly outdoors, may include stairs and narrow corridors
  • Minimum age 11; photo ID required, preferably a passport
  • Non-UK nationals need Office for Nuclear Regulation clearance at least 4 weeks ahead
  • Sizewell Visitor Center: additional interactive exhibition, separate from the tour
  • Sizewell C Bus Tour: additional guided minibus tour, booked in advance

Details may change. Check the operator’s website before visiting.

Sources and image credits

Image credits

Photo: John Fielding, CC BY 2.0 (creativecommons.org/licenses/by/2.0), via Wikimedia Commons (commons.wikimedia.org/wiki/File:Aerial_photograph_of_Sizewell_B_Nuclear_Power_Station_2014_(John_Fielding).jpg)

Photo: Mat Fascione, CC BY-SA 2.0, via Wikimedia Commons