Inside World Economy – Home
Terraced walls and winding haul roads inside the Super Pit gold mine
Kalgoorlie-Boulder · AustraliaSite Visit · Open to the public

Super Pit Tour

See one of Australia’s largest gold mines at work, from haul roads shared with giant dump trucks.

Why It Matters

After over 130 years of mining, this gold field is still expanding

Northern Star runs this open pit on the Golden Mile, a gold-bearing strip where a gold rush began in 1893. Two underground mines and two processing plants complete the operation. A bus tour leads onto the working site.

Only one Australian gold mine produced more in 2025–26

The operation produced about 14.9 metric tons of gold in the year to June 2026. The only larger producer was Boddington, a gold and copper mine also in Western Australia.

An expansion of about AUD 1.8 billion doubles ore-processing capacity

The enlarged Fimiston processing plant raises capacity from 13 to 27 million metric tons of ore a year. It began operating in stages in mid-2026; full output is planned for 2028–29.

Open-pit mining here is now approved to continue until 2034

In 2025 the state approved Fimiston South, a widening of the pit’s southern end. It extends open-pit mining by seven years, to 2034.

About 2,000 people work for the mine in a city of about 29,000

The open pit, two underground mines and two processing plants employ 1,990 people, some local, others flying in. The 2021 census counted 29,068 residents in the city.

Worth Knowing

About 280 metric tons of gold were mined across Australia in 2025, the third-largest amount after China and Russia.

More than 1,000 ore lodes – thin gold-bearing veins – run through the Golden Mile, some up to 1,800 meters long and 1,200 meters deep.

More than 1 million metric tons of rock slid from the pit’s east wall in May 2018, and repairing it took more than four years.

More than 3,000 kilometers of tunnels had been dug under the Golden Mile by 1903, and the pit now exposes some of them.

Two large haul trucks on a dusty road inside an open-pit mine

What You Experience

What the visit covers

  1. View the mining operation from the tour’s private lookout

    A viewing platform inside the site, reserved for tour groups, looks over the working pit, where trucks carry ore and waste rock up the haul roads.

  2. Travel the haul roads alongside giant Caterpillar 793 dump trucks

    The tour bus shares the mine’s haul roads with Caterpillar 793 trucks, each built to carry more than 200 metric tons of rock. It does not descend to the pit floor.

  3. Watch the site’s expansion projects take shape

    The tour gives a close view of the large expansion projects now under way across the mine site.

  4. Learn how the mine works from a local guide

    A local guide comments throughout the tour and answers questions about how gold is mined on the site.

What You Need to Know

Plan your visit

Access
Open to the public
Experience Type
Site Visit
Cost
AUD 72
Tour Times
Usually Monday to Friday, 09:00
Booking
Book ahead online; tours sell out quickly in peak season

Access & Logistics

  • Guided bus tour of about 1.5 hours on the working mine site
  • Long sleeves, long trousers and enclosed shoes with socks are compulsory
  • From age 4; departures depend on minimum numbers and the weather
  • Not part of the tour: the free public Super Pit Lookout, usually open daily 07:00–19:00

Details may change. Check the operator’s website before visiting.

Sources and image credits

Why it matters

Image credits

Photo: Chris Olszewski, CC BY-SA 4.0 (creativecommons.org/licenses/by-sa/4.0), via Wikimedia Commons (commons.wikimedia.org/wiki/File:Super_Pit_Gold_Mine,_Kalgoorlie,_WA,_2023,_11.jpg)

Photo: Rr2000, CC BY-SA 3.0, via Wikimedia Commons