Inside World Economy – Home
voestalpine Steelworks Tour, Linz
Linz · AustriaFactory Tour · Open to the public

voestalpine Steelworks Tour

Follow steel from iron ore to the car door on a guided bus tour through a working steelworks.

Why It Matters

Carmakers in Europe buy steel from the pioneer of oxygen steelmaking

voestalpine, a steel and technology group headquartered in Linz, makes flat steel for carmakers, energy companies and machine builders at its main steelworks. A guided exhibition tour is followed by a bus tour to the factory’s production units.

The group runs about 500 companies and sites in over 50 countries

Group-wide, it had almost 50,000 employees and revenue of EUR 15.1 billion in the 2025/26 business year, with the steel division as its largest unit.

The automotive industry is the steel division’s largest customer

The automotive sector accounted for 38 percent of the division’s revenue in the 2025/26 business year, and 87 percent of its revenue came from customers in the EU.

An electric arc furnace is due to replace a blast furnace in 2027

Powered by renewable electricity, it is designed for about 1.6 million metric tons of steel a year. One of the site’s three blast furnaces is to be shut down once it runs.

Most of the world’s steel comes from a process industrialized in Linz

Oxygen converters, known as the LD process, made 69.4 percent of global crude steel in 2025. The first industrial heat was blown in Linz in November 1952.

Worth Knowing

A hall 65 meters high and 100 meters long is to house the site’s electric arc furnace from 2027.

7.6 million metric tons of crude steel came from Austria in 2025, 22nd among the world’s steel-producing countries.

An hour or less is what an oxygen converter needs to turn iron into steel, against up to 12 hours in an open-hearth furnace.

45.8 percent of the EU’s crude steel came from electric arc furnaces in 2025, against an estimated 10.6 percent in China.

voestalpine Steelworks Tour, Linz

What You Experience

What the visit covers

  1. Visitors walk through a grid of about 138 metric tons of steel

    The hanging structure links three of the exhibition’s five levels and carries about 8,500 individually controlled LED lights.

  2. A tour bus carries you across the steelworks

    The buses come with a trained guide and carry multimedia technology.

  3. The tour may stop at Blast Furnace A

    Which units a tour visits depends on operations on the day.

  4. See how steel strip takes shape in the hot rolling mill

    Slabs cast in the steel plant are rolled into steel strip here, the stage at which the site’s flat steel takes shape.

  5. The chain from iron ore ends at the car parts plant

    This unit of the group makes parts for cars. Whether a tour reaches it depends on operations on the day.

What You Need to Know

Plan your visit

Access
Open to the public
Experience Type
Factory Tour
Cost
Adults (combined ticket): EUR 29; Exhibition only EUR 14, families EUR 29–58
Tour Times
Mon–Sat, 09:00–17:00, closed on holidays
Booking
Book online or through customer service

Access & Logistics

  • Combined ticket: guided exhibition tour, then 1.5-hour factory tour by bus
  • Experience Tour: tablet instead of a guide in the exhibition, then the factory tour
  • Factory tour: not for children under 6

Details may change. Check the operator’s website before visiting.

Sources and image credits

Why it matters